MK Diamond Products Saw MK-170 User Manual Page 14

  • Download
  • Add to my manuals
  • Print
  • Page
    / 30
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 13
MK-170 Revision 02/02, Effective Date February 11, 2002 Page 14
SETUP, ADJUSTMENT and OPERATION
SETUP:
1. Pre-start Inspection:
Prior to beginning work, a pre-start inspection of the saw should be preformed.
2. Water Pump Preparation:
1. To prevent the possibility electrical shock, the MK-170 MUST be de-energized when preparing
the Water Pump for operation.
2.
To prevent the possibility of electrical shock, use only MK Diamond qualified replacement parts
(A)
Ensure the ON/OFF Switch is
in the OFF position
(B)
Inspect the Pump Assembly for
damage – ensure the cord is
free of cracks or cuts
(C)
Inspect the Diamond Blade for
damage – verify the blade is
correct for the material being cut
(D)
Inspect the MK-170 for
damage – ensure the cord is
free of cracks or cuts
Inspect for
damage
Off
Position
ON/OFF
Switch
Inspect for
damage
Inspect for
cracks or cuts
Inspect for cracks,
de-bonding, etc.
(A)
Install Water Pump Discharge
Fitting
(B)
Remove the Cutting Table from
the Water Pan (Note the
Cooling Transfer Tube)
(C)
Press the end of the Cooling
Transfer Tube onto the Water
Pump Discharge Fitting
Discharge
Fitting
Pump
Cooling
Transfer Tube
Press on
Discharge
Fitting
Cutting
Table
Water
Pan
Cooling
Transfer Tube
Page view 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 29 30

Comments to this Manuals

No comments